Tool AT-W57REV. 2026-A
Network socket planner: how many sockets does your office need, and which cabinet fits?
Allow one double socket per workstation, another per access point, and one reserve double socket per workroom, meeting room or classroom. Each cable run from the patch panel to the socket may be no longer than 90 m, or 100 m with patch cables. Four rooms with 24 connections, a router, NAS and UPS fit in a 15 U wall cabinet. The planner calculates this for your rooms and prints a planning sheet, distributor sheet and acceptance checklist.
- free
- no sign-up
- runs in your browser
01 / PLANNER
Enter your rooms and see the sockets and cabinet you need
Planner · Sockets, cable runs and network cabinet
A basis for planning, not a bill of quantities. The lengths are estimates; only measurements after installation show the actual length of a cable run.
Runs in your browser. Nothing is sent; the CSV and plan are created as files on your device.
Distributor sheet
Patch panel port allocation. Neutral according to BSI INF.12.A11: only port, identifier and reserve. What is connected to a socket is recorded in the as-built register.
| Patch panel port | Identifier on the socket | Reserve |
|---|
Cabling acceptance checklist
Prepared for the acceptance report according to BSI INF.12.A6 (IT-Grundschutz-Kompendium, Edition 2023).
- Scope checked against the socket list: number of sockets, connections and patch panel ports. (INF.12.A6)
- Agreed before placing the order how the contractor will provide written evidence of compliance with the standards, for example with a test report for each cable run using the same identifiers as on the socket and port. The evidence is available no later than the acceptance date. (INF.12.A6)
- The socket and patch panel port carry the same neutral identifier. (INF.12.A10)
- Reserve cables are labelled at both ends. (INF.12.A8)
- The distributor sheet is in the cabinet. (INF.12.A11)
- The master documentation is updated no later than 4 weeks after completion. (INF.12.A10)
- Openings and firestops have been properly sealed. (INF.12.A8)
- The acceptance report is signed and forms part of the documentation. (INF.12.A6)
The list deliberately does not name a testing standard for the test report: DIN Media lists DIN EN 50346:2010-02, cited by the BSI, as withdrawn.
Place, date, client
Place, date, contractor
02 / SOCKETS
How many network sockets per workstation and room?
EN 50173-2 requires at least one connection for each workstation. Most plans allow for two, meaning a double socket; with comprehensive Wi-Fi coverage, the trend is towards one. This is how a technical article in Netzwerk Insider summarises it (Kell 2024); the standard itself must be purchased. The planner uses two, which you can change to one.
The reserve matters more than the number at the desk. The BSI identifies it as a typical weakness that plans are “often based exclusively on current demand” (INF.12, 2.2), and requires future needs to be included (INF.12.A2). That is why every room with workstations gets a reserve double socket, including the workshop, as does every meeting room, group room or classroom, even without fixed workstations. Storage rooms and equipment rooms without workstations do not get one.
| Device | Socket | PoE |
|---|---|---|
| Workstation | 2 connections, rounded up to double sockets | no |
| Printer | Single socket | no |
| Display | Single socket | no |
| Phone | Single socket | depending on the phone |
| Access point | Double socket, second connection as a reserve | yes |
| Camera | Single socket | yes |
| Door station | Single socket | yes |
| Other | Single socket | no |
| Reserve | 1 double socket per room with workstations and per meeting room, group room or classroom | no |
Why have sockets at all when Wi-Fi is available? Wireless devices share the cell. A single device with poor reception brings the throughput of all the others down to its speed Heusse et al. 2003, and on a large campus, the delay for every hundredth packet exceeded 250 ms Sui et al. 2016. That is too inconsistent for a till, a printer or a workstation used for video conferencing. In households, the bottleneck was more often in the Wi-Fi than in the internet connection Sundaresan et al. 2016; an office is not a household, so the findings have limited applicability.
Access points therefore get their own cable. If they are linked wirelessly, throughput per device falls with each additional one Jun and Sichitiu 2003, because they all share the same channel Gupta and Kumar 2000. The Wi-Fi planner calculates where the access points go and how many are needed; enter that number here. The double socket at the access point has a second connection for a future device on the ceiling. It offers only limited protection against failure: even in data centres, redundancy reduced the average impact of a failure by only 40 per cent Gill et al. 2011.
03 / CABLE RUN
90 metres of installation cable, 100-metre channel
Copper Ethernet is designed for a channel of no more than 100 m: 90 m of permanently installed cable from the patch panel to the socket and a total of 10 m of patch cables at both ends (ISO/IEC 11801-1). The planner allows 4 m of patch cable per cable run and shows the channel for each room.
The length of each cable run is the route to the distributor plus 3 m of reserve at the cabinet and 0,5 m at the socket. If you only have the floor plan, enter the straight-line distance; the planner multiplies it by 1,5. A route along walls follows right angles, making it a good 1,41 times as long, with the corridor and cable route added on top. Each floor change adds 4 m. These are values based on experience, not a standard; you can change each one.
- Green up to 80 m. Enough margin for an estimate that turns out longer during installation.
- Yellow up to 90 m. Still acceptable. Measure the route on site before ordering the cable.
- Red above that. A second distributor closer to the room, connected to the first, keeps the cable run below 90 m.
Cabling class and quantity
The default is Class EA: Category 6A sockets and patch panels; in Germany, Cat. 7 is usually offered as installation cable (Kell 2024). The reason is the access point. In simulations, Wi-Fi 7 delivers considerably more throughput than Wi-Fi 6 López-Pérez et al. 2019, with target data rates of up to 40 Gbit/s Khorov et al. 2020. A cable installed in the wall today should still support the next access point.
Installation cable is available in coils, boxes and on drums, with lengths of 100, 200, 500 and 1000 m sold in Germany. A cable run cannot be pieced together. The planner therefore allocates the cable runs to the packs by length, longest first, and shows the remainder for each pack. If the remainder is shorter than your shortest cable run, it is waste. With duplex cable, a double socket needs one pull instead of two.
For the PoE calculator, the planner provides a line with the number of access points, cameras, door stations and phones. If more than 24 PoE cables share one route, it flags this: heat increases resistance in the cable Tuenge et al. 2018, and the PoE calculator works out how large a bundle may be.
04 / CABINET
How many rack units does the network cabinet need?
One rack unit (U) is 44,45 mm high, according to the construction standard DIN IEC 60297, which the BSI includes in its list of standards. Everything that goes into the cabinet is counted. A patch panel with 24 ports occupies 1 U, and cable management below it another. Add the switches, shelves for desktop devices such as routers and NAS units (1 U plus device height ÷ 44,45 mm, rounded up), servers, UPS and power strip. A 25 % reserve is added to the total, with a minimum of 2 U, because the BSI requires expected growth to be included (INF.12.A16).
| Item | U |
|---|---|
| Patch panel PF1 | 1 |
| Cable management | 1 |
| Switch, 24 ports | 1 |
| Shelf: NAS, router or modem | 5 |
| Power strip | 1 |
| UPS | 2 |
| occupied | 11 |
| 25 % reserve, at least 2 U | 3 |
| total | 14 |
11 U occupied, 3 U reserve, 14 U in total: a wall cabinet with 15 U. A cabinet with 12 U accommodates the devices but leaves only 1 U free, less than the minimum reserve of 2 U. The cabinet sizes in the planner are common sizes; the manufacturer's range shows which are available.
Depth, weight and heat
A cabinet can be tall enough and still be too shallow. If you enter the device depths from their datasheets, the planner uses the deepest device plus 100 mm for connectors and cables and compares this with the cabinet's usable mounting depth. For a wall cabinet, also check the load capacity of both the cabinet and the wall, including the UPS.
For heat, the planner adds up the power ratings from the datasheets. It does not set a temperature limit of its own: the BSI requires temperature and humidity to remain within the datasheet limits (INF.5.A10). Data centres, too, generally follow cautious manufacturer recommendations, and higher setpoints had limited effects on reliability there El-Sayed et al. 2012. The power supply rating of a PoE switch comes from the PoE calculator, and the UPS runtime from the UPS calculator.
Where the distributor may be located
| Question | Reference |
|---|---|
| Is the room not used as a passage to other rooms? | INF.5.A2 |
| Is the room not used for storage or cleaning supplies? | INF.5.A7 |
| Is the room free of water or heating pipes? | INF.5.A11 |
| Does the temperature stay within the range specified in the equipment datasheets? | INF.5.A10 |
| Can the room or cabinet be locked? | INF.5.A3 and 2.2 |
If there is no dedicated room, a lockable cabinet may fulfil the requirements with as nearly equivalent protection as possible (INF.5, 1.1). Here, lockable mainly means that nobody accidentally changes a connection. An electrician installs the power socket at the cabinet. Power strips should not be plugged into one another, because poor-quality strips can become an ignition source (INF.12, 2.7 and A13). The BSI requirements are technical recommendations; the planner therefore says “according to your information” and gives the reference.
05 / DOCUMENTATION
Label, document, accept
Each connection gets an identifier made up of the room number and a sequential number, such as R1.01-01, along with a port on the patch panel, such as PF1-01. The same identifier appears at the socket and the port. It always begins with a letter so that Excel does not turn “1.01” into a date. The planner does not include the room's use; a room without a number gets its row number, such as R3-01: labelling should be as neutral as possible (BSI INF.12.A10). Many serious outages occur during ongoing changes to the network Govindan et al. 2016; anyone at the cabinet should know which port belongs to which socket without guessing. We have not found a study that directly measures the benefit of labelling.
Distributor sheet
Kept in the cabinet. Only the port, identifier and reserve, as neutral as the BSI recommends (INF.12.A11). The footer shows the revision date and the latest date by which the documentation must be checked against the installation: 4 years after the revision date (INF.12.A10).
As-built register
Stays with you. A CSV with identifier, port, room, use, length, traffic light, cable type and reserve, UTF-8 with semicolons, with formula prefixes neutralised. If Excel does not open it correctly, the CSV import helper can help. Save the plan itself as a JSON file and load it again later; it also stays on your device.
Acceptance with a checklist and test report
A checklist should be prepared for acceptance of new cabling, and the contractor must provide written evidence of compliance with the standards no later than the acceptance date (INF.12.A6). The planner prints the checklist with the scope from your plan. It is best to agree what this evidence will look like before placing the order, for example a test report for each cable run using the same identifiers as at the socket and port. The list deliberately does not name a testing standard: DIN Media lists DIN EN 50346:2010-02, cited by the BSI, as withdrawn with no successor.
06 / WORKED EXAMPLE
Four rooms, 24 connections, one wall cabinet
The example is the planner's default, calculated using the values in the table below.
| Room | Input | Connections | Cable run |
|---|---|---|---|
| R1.01 Reception | 2 workstations, printer, 12 m route | 7 | 15,5 m |
| R1.02 Office | 4 workstations, 18 m route | 10 | 21,5 m |
| R1.03 Meeting room | Display, access point, 24 m route | 5 | 27,5 m |
| R2.01 Storage room or workshop | Access point, 50 m straight-line distance, 1 floor higher | 2 | 82,5 m |
- Cable runs. Route plus 3,5 m of allowances; the storage room using straight-line distance: 50 × 1,5 + 4 + 3,5 = 82,5 m, yellow.
- Ports. 24 connections on 1 patch panel. The switch has 16 ports used by the rooms plus the router and NAS, making 18: a switch with 24 ports, 6 free. Reserve double sockets and the second connection at each access point remain without a switch port. PoE ports: 2.
- Cable. Duplex: 291,5 m in 11 pulls, 1 × 500 m (pack 1: 291,5 m used, 208,5 m remaining); simplex: 43 m in 2 pulls, 1 × 500 m (pack 1: 43 m used, 457 m remaining). Without duplex, the simplex requirement would be: 626 m in 24 pulls, 2 × 500 m (pack 1: 496 m used, 4 m waste remaining; pack 2: 130 m used, 370 m remaining).
- Cabinet. 11 U occupied, 3 U reserve, 14 U in total: a wall cabinet with 15 U. A cabinet with 12 U accommodates the devices but leaves only 1 U free, less than the minimum reserve of 2 U.
| Rule | Default | Origin |
|---|---|---|
| Connections per workstation | 2, meaning one double socket | Kell 2024; at least one under EN 50173-2 |
| Reserve per room | one double socket in every room with workstations and in meeting rooms, group rooms and classrooms; none in storage rooms, workshops or equipment rooms without workstations | BSI INF.12, 2.2 and A2 |
| Access point | Double socket: one connection for the AP, one as reserve | Kell 2024 |
| Printer, display, camera, door station, other | one single socket each | In-house default |
| Allowances per cable run | 3 m at the cabinet, 0,5 m at the socket, 4 m per floor change | In-house default |
| Detour factor for straight-line distance | 1,5 | In-house default: √2 ≈ 1,41 along walls, plus corridor and cable route |
| Traffic light per cable run | green up to 80 m, yellow up to 90 m, red above that | ISO/IEC 11801-1 (90 m); 80 m in-house default |
| Patch panel | 24 ports in 1 U, plus 1 U of cable management | Manufacturer specification, Cat. 6A |
| Shelf for desktop equipment | 1 U plus equipment height ÷ 44,45 mm, rounded up, 2 devices per shelf | U according to DIN IEC 60297; allocation is an in-house default |
| Reserve space in the cabinet | 25 %, at least 2 U | BSI INF.12.A16 (allow for growth); percentage is an in-house default |
| Depth | deepest device plus 100 mm compared with the mounting depth in the datasheet | In-house default |
07 / METHOD
How to plan sockets and distributors
- List the rooms. Include workstations and everything that needs a permanent cable connection: printer, display, till, camera, door station.
- Wi-Fi first. The access points come from the Wi-Fi planner; for industrial halls, see the guide Wi-Fi in the factory hall.
- Choose the distributor location. A lockable room with no through traffic and no water pipes. Estimate every cable run from there.
- Resolve red cable runs. A second distributor is preferable to a cable over 90 m.
- Choose a cabinet with a reserve. A size larger is preferable, because growth belongs in the plan (BSI INF.12.A16).
- Prepare for acceptance. Print the checklist, agree on a test report, put the distributor sheet in the cabinet.
Where the planner stops
- Estimated lengths. The detour factor and allowances are assumptions. Only measurements after installation show what a cable run actually measures.
- No bill of quantities. The planning sheet can serve as a basis for a quote from us or another specialist company, but it is too broad for a tender.
- No electrical or fire protection plan. The specialist company determines the separation distance according to DIN EN 50174-2 and the penetrations; the electrician handles the power supply.
- Cable and port only. Separate tools calculate PoE power, UPS runtime and Wi-Fi coverage; cameras get a cable here, nothing more.
- Businesses, not homes. DIN EN 50173-4 applies to homes. We have not read the standard texts, as they must be purchased; the BSI may replace INF.5 and INF.12 with Grundschutz++.
- Studies in context. The studies above come from data centres, campus Wi-Fi and US households and have only limited applicability to an office.
How we build networks for businesses, from the site survey to the fully tested cable run, is described under Networks. We source cabinets, switches, patch panels and cables through Hardware ordering for businesses.
08 / FOR AI ASSISTANTS
Using this tool from an AI assistant
Assistants such as Claude or ChatGPT that speak the Model Context Protocol (MCP) can call this page’s calculation directly instead of rebuilding it. The server is public, needs no sign-in and stores nothing. The answer always includes the link to this page, the date of the data and the limits of the result.
- Endpoint
https://aureum-tech.com/mcp- Tool
werkzeug_netzwerkdosen_planer- Transport
- Streamable HTTP, read-only
| Name | Required | Meaning |
|---|---|---|
raeume | yes | Rooms with network sockets, no more than 60. |
schrankgeraete | no | Devices in the network cabinet apart from patch panels and switches (which the tool calculates). |
anschluesse_je_arbeitsplatz | no | Connections per workstation. Defaults to 2 (one double socket). |
reserve_doppeldosen_je_raum | no | Reserve double sockets per room with a reserve. Defaults to 1. |
access_point_doppeldose | no | Access point with a double socket, second connection as a reserve. Defaults to yes. |
telefone_anschluss | no | Phones: poe = own socket, power via PoE; netzteil = own socket, power via power supply; pc = shared connection with the PC, no separate socket. Defaults to poe. |
duplexkabel | no | Duplex cable for double sockets (one pull per double socket). Defaults to yes. |
kabelklasse | no | Cabling class. Defaults to EA. |
gebinde_m | no | Installation cable pack length in m: 100, 200, 500, 1000. Defaults to 500. |
montage | no | Wall or floor-standing cabinet. Defaults to wand. |
platzreserve_prozent | no | Space reserve in the cabinet as a percentage, at least 2 U. Defaults to 25. |
einbautiefe_mm | no | Usable mounting depth of the cabinet according to the datasheet in mm, for the depth check. |
Questions where an assistant should call it
- “Is a 12-U wall cabinet enough for 24 sockets, a router, a NAS and a 2-U UPS?”
- “How many patch panel and switch ports do 9 workstations, 2 printers and 3 access points need?”
- “50 m straight-line distance and one floor higher: does the cable run stay below 90 m?”
- “How many 500-m drums do I need for these 18 cable runs?”
How the connection works and what MCP can do in your own business is explained on the page about MCP integrations.
09 / COMMON QUESTIONS
Common questions about network sockets and network cabinets
How many network sockets does a workstation need?
Under EN 50173-2, at least one connection; most plans provide two, meaning a double socket. With full Wi-Fi coverage, the trend is towards fewer. In addition, every room with workstations and every meeting room, group room or classroom gets a reserve double socket, because expansion is only possible where cables and cable routes allow it (BSI INF.12, 2.2). Access points get a double socket; printers, displays and cameras each get a single socket.
What is the maximum length of a network cable?
The fixed cable from the patch panel to the socket may be 90 m long. Including the patch cables at both ends, the maximum is 100 m (ISO/IEC 11801-1). The planner shows yellow from 80 m, because estimated lengths tend to turn out longer in practice. If a room is further away, a second distributor belongs nearby, connected to the first.
How many rack units does my network cabinet need?
Allow a 1 U patch panel and 1 U of cable management for every 24 connections, plus switches, shelves for the router and NAS, a UPS and a power strip. In the worked example, this comes to 11 U. With a 25 % reserve, at least 2 U, the total is 14 U, meaning a 15 U wall cabinet. A 12 U cabinet holds the equipment but leaves only 1 U free.
Is duplex cable worthwhile for double sockets?
Duplex cable combines two cables in one sheath, so a double socket needs one pull instead of two. In the worked example, there are 13 pulls instead of 24: 291,5 m of duplex and 43 m of simplex instead of 626 m of simplex. The planner calculates the cable quantity per pack, because a cable run cannot be pieced together.
Is a green traffic light enough, or does someone need to take measurements?
The traffic light uses lengths that you estimate. Only measurements after installation show how long a cable run really is and whether it has been terminated properly. We test every cable run we install, and the test report forms part of your documentation (BSI INF.12.A6 and A10).
What does the test report contain?
For each cable run, the identifier as shown on the socket and patch panel, plus the date and result. This lets you match every line of the report to the wall socket and the cabinet.
What belongs on the sheet in the distributor?
Only the port, identifier and reserve marking. Who or what is connected to a socket is recorded in the as-built register rather than in the cabinet, as recommended by the BSI (INF.12.A11). Check the documentation against the installation after no more than 4 years (INF.12.A10); the planner prints the date on the sheet.
Where does the network socket planner stop?
It plans sockets, cable runs, ports and a cabinet from estimated lengths. It does not replace a site survey; the specialist contractor determines fire protection and separation from power cables, and the electrician installs the power sockets. After a site survey, we install the cables from the distributor to the sockets ourselves and hand over every cable run fully tested; for larger cabling projects and openings through fire walls, we bring in a specialist electrical contractor.
10 / STUDIES AND SOURCES
What the tool is based on
The guide values and advice above are based on these 11 research papers. Each has been checked via its DOI or the publisher's page (most recently on 26. November 2026): it exists, has not been retracted, and its findings remain relevant to the question today.
Sui, K.; Zhou, M.; Liu, D. et al. (2016): Characterizing and Improving WiFi Latency in Large-Scale Operational Networks. MobiSys 2016 (14th Annual International Conference on Mobile Systems, Applications, and Services), pp. 347–360
Finding Measurements from over 47.000 devices on a university campus Wi-Fi network: latency has a long tail. The 90th percentile is around 20 ms, the 99th around 250 ms.
In the tool The till, video conferencing workstation and printer each get their own socket in the planner instead of relying on Wi-Fi.
doi.org/10.1145/2906388.2906393 · Conference paper
Sundaresan, S.; Feamster, N.; Teixeira, R. (2016): Home Network or Access Link? Locating Last-Mile Downstream Throughput Bottlenecks. Passive and Active Measurement (PAM 2016), Lecture Notes in Computer Science, pp. 111–123
Finding In 2.652 US households, the bottleneck was more often in the Wi-Fi than in the internet connection, especially for connections above 20 Mbit/s.
In the tool Supports connecting fixed workstations by cable. Households are not businesses, so the findings have limited applicability.
doi.org/10.1007/978-3-319-30505-9_9 · Conference paper
Heusse, M.; Rousseau, F.; Berger-Sabbatel, G., et al. (2003): Performance anomaly of 802.11b. IEEE INFOCOM 2003, Vol. 2, pp. 836–843
Finding If a device transmits slowly because of poor reception, the throughput of all the others in the same wireless cell falls to roughly its speed.
In the tool Connecting fixed devices by cable frees up Wi-Fi capacity for devices that move.
doi.org/10.1109/INFCOM.2003.1208921 · Conference paper
Jun, J.; Sichitiu, M. L. (2003): The nominal capacity of wireless mesh networks. IEEE Wireless Communications 10 (5), pp. 8–14
Finding In a mesh network that forwards data over several wireless links, throughput per node decreases as O(1/n).
In the tool Every access point gets a cable in the planner; mesh remains the fallback.
doi.org/10.1109/MWC.2003.1241089 · Journal article
Gupta, P.; Kumar, P. R. (2000): The capacity of wireless networks. IEEE Transactions on Information Theory 46 (2), pp. 388–404
Finding Throughput per node in a wireless network decreases as the number of nodes grows, even with the best arrangement, because all nodes share the medium.
In the tool Together with Jun 2003, supports the rule of cabling access points instead of linking them wirelessly.
doi.org/10.1109/18.825799 · Journal article
López-Pérez, D.; Garcia-Rodriguez, A.; Galati-Giordano, L. et al. (2019): IEEE 802.11be Extremely High Throughput: The Next Generation of Wi-Fi Technology Beyond 802.11ax. IEEE Communications Magazine 57 (9), pp. 113–119
Finding Introduces Wi-Fi 7 (802.11be); simulations show throughput gains over 802.11ax.
In the tool An access point's connection should support more than 1 Gbit/s, which is why Class EA is the default.
doi.org/10.1109/MCOM.001.1900338 · Journal article
Khorov, E.; Levitsky, I.; Akyildiz, I. F. (2020): Current Status and Directions of IEEE 802.11be, the Future Wi-Fi 7. IEEE Access 8, pp. 88664–88688
Finding Wi-Fi 7 doubles the channel width and increases the number of data streams; target data rates are up to 40 Gbit/s.
In the tool As with López-Pérez 2019: the cables to the access point are planned for the next generation of devices, not the current one.
doi.org/10.1109/ACCESS.2020.2993448 · Review
Gill, P.; Jain, N.; Nagappan, N. (2011): Understanding network failures in data centers. ACM SIGCOMM 2011, pp. 350–361
Finding The first large-scale analysis of failures in data centre networks: redundancy reduced the average impact of a failure by only 40 per cent.
In the tool The second connection at the access point counts as a reserve in the planner and is not presented as protection against failure. The figures come from data centres.
doi.org/10.1145/2018436.2018477 · Conference paper
Govindan, R.; Minei, I.; Kallahalla, M. et al. (2016): Evolve or Die. ACM SIGCOMM 2016, pp. 58–72
Finding Over 100 severe outages at a global content provider: many occurred during ongoing network maintenance and changes.
In the tool This is why there is a distributor sheet showing the current connections, with the same identifier on the socket and port. The study does not directly measure the benefit of labelling.
doi.org/10.1145/2934872.2934891 · Conference paper
El-Sayed, N.; Stefanovici, I. A.; Amvrosiadis, G. et al. (2012): Temperature management in data centers. ACM SIGMETRICS/PERFORMANCE 2012, pp. 163–174
Finding Most data centres set their cooling according to cautious manufacturer recommendations. Field data and climate chamber experiments show that higher set points are possible with limited effects on reliability.
In the tool The ambient temperature in the datasheet is the limit; the planner does not set a stricter threshold of its own.
doi.org/10.1145/2254756.2254778 · Conference paper
Tuenge, J.; Kelly, K.; Chen, Y. et al. (2018): Connected Lighting Systems Efficiency Study: PoE Cable Energy Losses, Part 2. Pacific Northwest National Laboratory for the U.S. Department of Energy, report PNNL-28099
Finding Bundling and bending barely increased cable loss below 30 °C; higher ambient temperatures increase conductor resistance and therefore loss.
In the tool If more than 24 PoE cables share a route, the planner refers you to the PoE calculator, which calculates heat and bundles.
doi.org/10.2172/1512365 · Research report
Standards, authorities and manufacturer data
- INF.12 Cabling, Edition 2023 · BSI, IT-Grundschutz-Kompendium
- INF.5 Room and cabinet for technical infrastructure, Edition 2023 · BSI, IT-Grundschutz-Kompendium
- Twisted Pair: Planning easier than ever? (06.05.2024) · Kell, H., Netzwerk Insider (ComConsult)
- DIN EN 50346:2010-02, status in the standards catalogue · DIN Media
11 / MORE TOOLS
Still have a question?
- AT-W2 · Home & business
Windows 10 check
Does this PC still get security updates, and what needs doing by October 2027? - AT-W3 · Home & business
Wi-Fi planner
How many access points or mesh units does your home, office or warehouse need? - AT-W4 · Businesses
IT emergency check
How quickly could your business get back to work after an outage? - AT-W5 · Businesses
E-mail check
Are your e-mails landing in spam? Your domain’s SPF, DKIM and DMARC in plain language. - AT-W6 · Businesses
UPS calculator
Which UPS keeps your server, router and till running long enough during a power cut? - AT-W8 · Businesses
XRechnung viewer
Received an XRechnung as an XML file? This makes it readable without the file leaving your computer.
Send us the copied summary. We come for a site survey, install the cables from the distributor to the socket and hand over each fully tested cable run with a test report, in Rodewisch and throughout the Vogtland.
+49 3744 4399760info@aureum-tech.comMon–Fri 8:00–17:00 · Straße der Jugend 5, 08228 Rodewisch